Commercial doors upgrade at the SCC daceyville center.
NRC Building Group team coordinated and designed new sliding doors to assist with accessibility issues. Design included drainage and waterproofing to prevent water entering the building with minimum threshold for elderly to move freely in and out of the balcony.